| R and B (P) Dang |
PMGSY Mahal Subbir Varsa road |
Executive Engineer |
636.54 |
616.70 |
05/11/2009 |
04/11/2010 |
04/11/2010 |
N.A |
| R and B Tapi |
Strengthening Saraiya-bandharpada-temka and Songadh Otta Road |
Executive Engineer |
502.46 |
561.67 |
05/10/2011 |
04/09/2012 |
14/03/2012 |
N.A |
| R and B (P) Dang |
Constructing various roads in Dang District Pkg 1 F.R |
Executive Engineer |
1144.42 |
1294.00 |
15/05/2012 |
14/04/2013 |
12/04/2013 |
N.A |
| National Highway Bharuch Division |
P.R from km 572/205 to 592/935 of N.H. No 56 in the state of Gujarat. |
Executive Engineer |
423.44 |
482.50 |
04/01/2014 |
03/04/2014 |
02/04/2014 |
N.A |
| National Highway Bharuch Division |
P.R rom km 648/000 to 655/800 935 of N.H. No 56 in the state of Gujarat |
Executive Engineer |
434.49 |
496.32 |
04/01/2014 |
03/04/2014 |
28/03/2014 |
N.A |
| National Highway Bharuch Division |
Construction of Roads in Uchchhal and Nizar Taluka under PMGSY |
Executive Engineer |
1721.83 |
1886.49 |
15/11/2013 |
14/10/2014 |
14/10/2014 |
N.A |
| R and B Surat Div 2 |
Widening and strengthening of Olpad-Sayan-Kathor Road |
Executive Engineer |
1510.96 |
11619.94 |
03/10/2012 |
15/05/2014 |
15/05/2014 |
N.A |